A new construction project that involved custom cabling needed for hosting festivals.

In winter of 2016, the Miller Stage area on the Summerfest grounds was updated and expanded. CC&N was hired to design and build a complete physical cabling infrastructure that would enhance the area’s wireless network. Extensive cabling was required due to the multiple technologies of the stage. Along with basic wireless needs, the Miller Stage area needed advanced AV cabling for a “plug & play” approach to connecting stage equipment, security system cabling, and extensive broadcast TV connectivity.

The desire spring completion deadline forced a winter installation and delays due to weather conditions occurred. There also over 2,000 disorganized original cabling runs through the grounds that presented a unique challenge.  CC&N technicians precisely identified the original cable and installed the new cabling in an approach that avoided disruptions to the existing Summerfest network.

Discuss Your Project With Us

After over 30 years in the business, we’ve covered almost every type of project need in almost every type of industry. If you don’t see a project featured in our gallery that helps, just call or submit an online request. We are happy to discuss, review your plans, or schedule a site walk through. If you have a very innovative requirement, we love the challenge!

What's Your Project?

  • This field is for validation purposes and should be left unchanged.

Or Call: 262-506-3199

Flexible Connectivity; Improved Festival Experience.